After -cut back bolt connection is via dual aspect seismic type and cut anchors , fittings to connect the stone with a stone wall skeleton fixation methods , through engineering practice, summed up the formation of this construction method .
 
First, the characteristics
1 , the force between the plates separate , stand-alone installation , the independent replacement node approach flexible.
2, connecting reliable, small slate weaken , reducing damage to the joints local stone stone panel has high seismic capacity .
3 , can accurately control the stone with conical bottom of the hole spacing to ensure wall surface flatness .
4 , a high degree of factory construction , plates on the wall after adjustment work less .
 
Second, the scope
For building height is not greater than 30m, or non- seismic design seismic intensity of not more than 7 degrees civil stone curtain wall construction.
 

Third, the process principle
Section dedicated grinding through the double back in the stone away from the plate edge 100 ~ 180mm inverted cone at the grind , inverted cone with after -cut anchor combines flexible nylon body and the board passed to the load through the skeleton of the main structure .
 
Fourth, the process
 
 
Fifth, the operating points
 
1 , pre-construction preparation: the main structure of concrete strength should not be less than C25; rear anchors in accordance with the design and specifications for field resistance to pullout test , skeleton stone wall before installation of the " four" test .
2 , Surveying : Through the main structure of the reference axis and the standard point for accurate positioning .
3, the metal frame processing, installation
3.1 Under construction stakeout graph examination actinomycetes accurate or not, according to site size processing cutting .
3.2 installed at both ends of the column with the facade , the pull-through lines installed in order for the middle column.
3.3 The level of construction control lines will lead to the column, check with the horizontal ruler .
3.4 requires the installation of beams according to design drawings . If welding , the response has been completed and the adjacent lower face protection. Welding, butt should be used to reduce the welding deformation, and check the welds after passing the brush rust .
4 , stone processing , grinding holes
4.1 Checking the stone color, size deviation and damage, etc. , if there are significant color, lack of edge , off angle , etc. should be replaced , after passing the stone plate by drawing number.
4.2 stone and frame connectors connected via picture , the top and bottom of the panel for grinding holes , holes from the edge 100 mm to 180 mm ; horizontal distance of not more than 600 mm.
Connections should use anchors manufacturers of complementary products ; connector connected with the metal skeleton should be strictly in accordance with existing regulatory requirements against rust , anti -corrosion measures .
精品人妻中文无码av在线 | 999热这里只有精品 999人在线精品播放视频 | 古代三级在线大全视频 | 少妇一晚三次一区二区三区 | 亚洲av日韩专区在线观看 | 国产在线精品二区 | 国产精品福利久久 | 天天爽夜夜爽夜夜爽精品视频 | 亚洲精品人成无码中文毛片 | 久久久久亚洲av无码专区体验 | 久久久无码一区二区三区 | 免费a级毛片无码a∨蜜芽试看 | 欧美乱人伦人妻中文字幕 | 亚洲欧洲精品a片久久99 | 亚洲国产精品国自产拍av | 久久天天躁狠狠躁夜夜不卡 | 国产精品视频福利视频网 | 亚洲成a人v欧美综合天堂麻豆 | 婷婷射精av这里只有精品 | 欧美xxxx黑人又粗又长 | 99国产精品久久久久久久成人 | 69久久精品无码一区二区 | 国产av无码专区亚洲av琪琪 | 亚洲乱亚洲乱少妇无码99p | 伊人色综合九久久天天蜜桃 | 中文字幕欧美人妻精品一区 | 久久精品一区二区三区四区 | 国产成人午夜高潮毛片 | 欧洲国产伦久久久久久久 | 又爽又高潮的bb视频免费看 | 一女被多男玩喷潮视频 | 亚洲熟妇无码一区二区三区导航 | 天堂8在线天堂资源bt | 丰满岳妇乱一区二区三区 | 成人午夜国产福到在线 | 亚洲最大中文字幕无码网站 | 国产欧美日韩专区发布 | 亚洲欧美色一区二区三区 | 91福利小视频 | 亚洲熟女少妇一区二区 | 国产精品人成人免费国产 |